Installation Process of Tower Crane


2014/7/11 0:48:27


 

 
Tower Crane Mast Section is set into a foundation with steel pedestals. The Mast Section is plumbed to a degree of 1:500 (i.e. it must not deviate more than 1 inch from plumb for every 500 inches vertical). After poured concrete and concrete setting, then the tower crane is ready to be erected.
The process continues as mast sections are added until the needed achieved height. The turntable (operator cabin included) is added in the same manner and is often the heaviest piece of the tower crane. In some applications this section is split to reduce weight on the mobile crane. This may add two hours to the tower crane erection process, so it is avoided when possible.
After the Turntable is installed the Tower Top is added and four large pins are added as the connecting members.